Chamartín Clara Campoamor
New connection with local trains and the Metro in Madrid
Boost on the Antequera-Granada High Speed Line
The key to a better-connected northwest, this line added 166 km to the high-speed network and improved connections with the northwest and north of the Iberian Peninsula, significantly reducing travel times.
24 octubre 2025
Nota de prensa
16 octubre 2025