EU "Connecting Europe Facility" (CEF) funding instrument
Actions

The "Connecting Europe Facility" (CEF) is co-financing the following actions with funding of 104.5 million euros:
Atlantic Corridor. Electrification of Medina del Campo-Salamanca-Fuentes de Oñoro
Mediterranean Corridor. Almussafes-Valencia section. Adaptation to UIC gauge.
Improvements to station accessibility.
- Project 2014-ES-TA-0473-M
- Estimated investment excluding VAT (million EUR):
3.8 M€. - CEF funding (million EUR):
1.2 M€.
Mediterranean Corridor. Algeciras-Madrid-Zaragoza-Barcelona section. Madrid-Vicálvaro. Studies
- Project 2014-ES-TM-0500-S
- Estimated investment excluding VAT (million EUR):
1.0 M€. - CEF funding (million EUR):
0.5 M€.
Mediterranean Corridor. ERTMS Cercanías Barcelona (suburban trains)
- Project 2014-ES-TM-510-W
- Estimated investment excluding VAT (million EUR):
10.4 M€. - CEF funding (million EUR):
5.2 M€.
Atlantic Corridor (Madrid-Valladolid Section) and Mediterranean Corridor (Madrid-Barcelona Section). ERTMS migration 2.3.0.d Phase II
- Project 2014-ES-TM-0512-W
- Estimated investment excluding VAT (million EUR):
0.8 M€. - CEF funding (million EUR):
0.4 M€.
Mediterranean Corridor. La Llagosta Terminal. Studies
- Project 2015-ES-TM-0329-S
- Estimated investment excluding VAT (million EUR):
0.8 M€. - CEF funding (million EUR):
0.4 M€.
Atlantic Corridor. Atlantic Rolling Highway. Modal exchange of all types of semi-trailer.
- Project 2016-EU-TA-0193-S
- Estimated investment excluding VAT (million EUR):
0.7 M€. - CEF funding (million EUR):
0.3 M€.
Union of connecting points between France and Spain. Studies for the reopening of the frontier railway crossing on the Pau-Zaragoza section.
- Project 2016-EU-TA-0210-S
- Estimated investment excluding VAT (million EUR):
2.2 M€. - CEF funding (million EUR):
1.1 M€.
Atlantic Corridor. Remodelling the Madrid-Chamartín railway complex for its adaptation to high-speed services
- Project 2016-ES-TM-0271-S
- Estimated investment excluding VAT (million EUR):
0.7 M€. - CEF funding (million EUR):
0.4 M€.
Atlantic and Mediterranean Corridor. Study of loading gauges in railway corridors for “rolling highway” services
- Project 2016-ES-TA-0278-S
- Estimated investment excluding VAT (million EUR):
1.5 M€. - CEF funding (million EUR):
0.8 M€.
Mediterranean Corridor. Castellbisbal-Vilaseca section. Adaptation to UIC gauge
- Project 2017-ES-TM-0063-W
- Estimated investment excluding VAT (million EUR):
285.0 M€. - CEF funding (million EUR):
57.0 M€.
LNGHIVE2 Infrastructure and logistics solutions
- Project 2017-ES-TM-0156-W
- Estimated investment excluding VAT (million EUR):
0.4 M€. - CEF funding (million EUR):
0.1 M€.
RAILNETEUROPE. Implementation of telematics applications for railway interoperability
- Project 2018-EU-TM-0063-S
- Estimated investment excluding VAT (million EUR):
0.6 M€. - CEF funding (million EUR):
0.3 M€.
FEDeRATED
- Project 2018-EU-TM-0119-S
- Estimated investment excluding VAT (million EUR):
1.5 M€. - CEF funding (million EUR):
0.8 M€.
I RAIL. Interoperability of the railway system with TAF TSI in TENT-T corridors
- Project 2018-EU-TM-0122-W
- Estimated investment excluding VAT (million EUR):
0.2 M€. - CEF funding (million EUR):
0.1 M€.
Madrid-Vicálvaro railway logistics terminal Phase I. Sub-phase I works and road studies.
- Project 2018-ES-TM-0129-M
- Estimated investment excluding VAT (million EUR):
20.1 M€. - CEF funding (million EUR):
4.0 M€.
Variable-gauge axle for freight rail (EVAM)
- Project 2018-ES-TM-0131-S
- Estimated investment excluding VAT (million EUR):
2.3 M€. - CEF funding (million EUR):
1.1 M€.
Railway connection to the exterior of Ferrol Port (works and studies)
- Project 2019-ES-TA-0032-M
- Estimated investment excluding VAT (million EUR):
0.8 M€. - CEF funding (million EUR):
0.4 M€.
Electrification of the Guillarei-Tu cross-border section
- Project 2019-ES-TA-0048-W
- Estimated investment excluding VAT (million EUR):
16.3 M€. - CEF funding (million EUR):
6.5 M€.
Atlantic Corridor. Sines/Lisbon-Madrid high-speed line. Madrid's urban node. Study of the Atocha station railway complex (Phase III)
- Project 2019-ES-TM-0252-S
- Estimated investment excluding VAT (million EUR):
0.6 M€. - CEF funding (million EUR):
0.3 M€.
750-meter railway sidings on the Zaragoza-Barcelona section of the Mediterranean Corridor
- Project 2020-ES-TM-0044-S
- Estimated investment excluding VAT (million EUR):
1.4 M€. - CEF funding (million EUR):
0.7 M€.
Total CEF investment and fundingHighlighted paragraph
- Estimated investment excluding VAT (million EUR):
408.6 M€. - CEF funding (million EUR):
104.5 M€.
(Data as of 31 December, 2023)