European Union's Connecting Europe Facility (CEF)

Actions

Bandera de Europa

The Connecting Europe Facility (CEF) is co-financing the following actions with funding estimated at 117.6 million euros:

Mediterranean Corridor. Almussafes-Valencia section.Adaptation to UIC gauge.
  • Project 2014-ES-TM-0438-W
  • Estimated investment excluding VAT (million EUR):
    € 41.7 M
  • CEF funding (million EUR):
    € 16.7 M
Mediterranean Corridor. Algeciras-Madrid-Zaragoza-Barcelona section.Madrid-Vicálvaro.Studies
  • Project 2014-ES-TM-0500-S
  • Estimated investment excluding VAT (million EUR):
    € 1.0 M
  • CEF funding (millions of EUR):
    € 0.5 M
Mediterranean Corridor. ERTMS Cercanías Barcelona (suburban trains).
  • Project 2014-ES-TM-510-W
  • Estimated investment excluding VAT (million EUR):
    € 10.4 M
  • CEF funding (million EUR):
    € 5.2 M
Mediterranean Corridor. La Llagosta terminal.Studies
Mediterranean Corridor. Castellbisbal-Vilaseca section.Adaptation to UIC gauge.
  • Project 2017-ES-TM-0063-W
  • Estimated investment excluding VAT (million EUR):
    € 285.0 M
  • CEF funding (million EUR):
    € 57.0 M
Atlantic and Mediterranean Corridor. Study of loading gauges in railway corridors for “rolling highway” services
Atlantic Corridor (Madrid-Valladolid Section) and Mediterranean Corridor (Madrid-Barcelona Section).ERTMS Migration 2.3.0.d Phase II.
Atlantic Corridor.Electrification of Medina del Campo-Salamanca-Fuentes de Oñoro.
  • Project 2014-ES-TM-0400-W
  • Estimated investment excluding VAT (million EUR):
    € 49.0 M
  • CEF funding (million EUR):
    € 19.6 M
Atlantic Corridor.Atlantic Rolling Highway.Modal exchange of all types of semi-trailer.
Atlantic Corridor. Remodelling of the Madrid-Chamartín railway complex for its adaptation to high-speed services
Atlantic Corridor. Sines/Lisbon-Madrid high-speed line. Madrid's urban node. Study of the Atocha station railway complex (Phase 3)
Improvements to station accessibility.
Union of connecting points between France and Spain.Studies for the restoration of the railway border crossing on the Pau-Zaragoza section.
LNGHIVE2 Infrastructure and logistics solutions
  • Project 2017-ES-TM-0156-W
  • Estimated investment excluding VAT (million EUR):
    € 0.4 M
  • CEF funding (millions EUR):
    € 0.1 M
Madrid-Vicálvaro railway logistics terminal Phase I. Sub-phase works and road studies.
  • Project 2018-ES-TM-0129-M
  • Estimated investment excluding VAT (million EUR):
    € 20.1 M
  • CEF funding (million EUR):
    € 4.0 M
Variable-gauge axle for freight rail (EVAM)
FEDeRATED
RAILNETEUROPE. Implementation of telematics applications for railway interoperability
I RAIL. Interoperability of the railway system with TAF TSI in TENT-T corridors
  • Project 2018-EU-TM-0122-W
  • Estimated investment excluding VAT (million EUR):
    € 0.2 M
  • CEF funding (millions EUR):
    € 0.1 M
Electrification of the Guillarei-Tu cross-border section
  • Project 2019-ES-TA-0048-W
  • Estimated investment excluding VAT (million EUR):
    € 16.3 M
  • CEF funding (million EUR):
    € 6.5 M
Railway connection to the port of Ferrol (works and studies)
Apartaderos ferroviarios de 750 metros en el tramo Zaragoza-Barcelona del Corredor Mediterráneo
  • Proyecto 2020-ES-TA-0044-S
  • Inversión estimada IVA excluido (millones de euros)
    1,4 M€.
  • Ayuda CEF (millones de euros)
    0,7 M€
Total CEF investment and fundingHighlighted paragraph
  • Estimated investment excluding VAT (million EUR):
    € 441.3 M
  • CEF funding (million EUR):
    € 117.6 M

(Data as of December 31, 2020)