EU "Connecting Europe Facility" (CEF) funding instrument

Actions

Bandera de Europa

The "Connecting Europe Facility" (CEF) is co-financing the following actions with funding of 104.5 million euros:

Atlantic Corridor. Electrification of Medina del Campo-Salamanca-Fuentes de Oñoro
  • Project 2014-ES-TM-0400-W
  • Estimated investment excluding VAT (million EUR):
    49.0M€.
  • CEF funding (million EUR):
    19.6 M€
Mediterranean Corridor. Almussafes-Valencia section. Adaptation to UIC gauge.
  • Project 2014-ES-TM-0438-W
  • Estimated investment excluding VAT (million EUR):
    8.9 M€.
  • CEF funding (million EUR):
    3.5 M€.
Improvements to station accessibility.
Mediterranean Corridor. Algeciras-Madrid-Zaragoza-Barcelona section. Madrid-Vicálvaro. Studies
Mediterranean Corridor. ERTMS Cercanías Barcelona (suburban trains)
Atlantic Corridor (Madrid-Valladolid Section) and Mediterranean Corridor (Madrid-Barcelona Section). ERTMS migration 2.3.0.d Phase II
Mediterranean Corridor. La Llagosta Terminal. Studies
Atlantic Corridor. Atlantic Rolling Highway. Modal exchange of all types of semi-trailer.
Union of connecting points between France and Spain. Studies for the reopening of the frontier railway crossing on the Pau-Zaragoza section.
Atlantic Corridor. Remodelling the Madrid-Chamartín railway complex for its adaptation to high-speed services
Atlantic and Mediterranean Corridor. Study of loading gauges in railway corridors for “rolling highway” services
Mediterranean Corridor. Castellbisbal-Vilaseca section. Adaptation to UIC gauge
LNGHIVE2 Infrastructure and logistics solutions
RAILNETEUROPE. Implementation of telematics applications for railway interoperability
FEDeRATED
I RAIL. Interoperability of the railway system with TAF TSI in TENT-T corridors
Madrid-Vicálvaro railway logistics terminal Phase I. Sub-phase I works and road studies.
Variable-gauge axle for freight rail (EVAM)
Railway connection to the exterior of Ferrol Port (works and studies)
Electrification of the Guillarei-Tu cross-border section
Atlantic Corridor. Sines/Lisbon-Madrid high-speed line. Madrid's urban node. Study of the Atocha station railway complex (Phase III)
750-meter railway sidings on the Zaragoza-Barcelona section of the Mediterranean Corridor
Total CEF investment and fundingHighlighted paragraph
  • Estimated investment excluding VAT (million EUR):
    408.6 M€.
  • CEF funding (million EUR):
    104.5 M€.

(Data as of 31 December, 2023)